After another contractor had installed a 2 - 3 mm epoxy system to the new extension and chillers, SPM discovered this was not good enough as the floor started flaking off. Armourcrete removed all the existing resin flooring and replaced the 2 - 3 mm system with Nuplex Nuthane SB 6mm polyurethane floor topping.