Alliance Pukeuri has been a client of Armoucrete for over 9 years. In this time we have repaired or replaced their existing epoxy and sureshield flooring and coving.
In 2016 Alliance built a new primal cut facility. This project included creating falls in the existing floor using a mixture of concrete and epoxy screeds. After completing this we applied Nuplex Nuthane SB with a nonslip. Along with the primal cut facility, the existing sureshield to the pelt room had lost its nonslip. Armourcrete removed the existing topping and applied Mapei Mapefloor MF 4mm Polyurethane resin floor topping